JEFFERSON – The Ashtabula County commissioners once again passed a resolution reordering the publication and solicitation for the re-bid of the Ashtabula County Agricultural Society (fairgrounds) New Building Project, which aims to enhance agricultural event facilities and provide additional storage, during their meeting Tuesday, March 3.
The project consists of all labor and materials to construct a new pre-engineered metal building to be used for agricultural events and storage. The property is zoned for agricultural use and is not subject to standard building codes and regulations.
The estimate of cost is $180,000.
The publication is March 5, with the bid opening on March 20.
Project completion date is June 30, 2026.
Funding for this project is provided through the American Rescue Plan Act (ARPA).
The building specifications include:
• A main building footprint of 50 feet by 136 feet
• A 16-foot by 60-foot lean-to located on the southwest corner with a continuous pitch roof
• Sixteen-foot-high sidewalls with 1-foot overhangs on both the eaves and gable ends
• Three overhead doors
• Four 36-inch outswing man doors installed
• A total building area 7,760 square feet
“We are going out to bid again. This is the third time. The successful bidder for this last round has not met the obligations,” Board of Commissioners President Casey Kozlowski said.
He encouraged the submission of bids for this project.
“And make sure that they follow the requirements that are outlined in the package,” Kozlowski said. “That has been a challenge for us. Several of the successful bidders have not completed the bid package…Third time’s a charm.”
The commissioners rescinded the award and rejected the bid of Dugger Acquisitions, LLC, for the project later in the meeting.
While awarded the bid on Jan. 22, Dugger Acquisitions failed to submit the required documentation necessary to execute a contract for the project.
Also at the meeting, the commissioners:
• Extended the agreement with the Geauga County commissioners for housing of inmates in the Geauga County Jail from April 1, 2026, through Dec. 31, 2026. The cost is not to exceed $230,000 for the term of the agreement.
• Ordered the publication and bids for aggregate and asphalt emulsion for use during the 2026 season for the Ashtabula County Engineer’s Department.
• Awarded the bid to Forterra Pipe and Precast dba Rinker Materials for reinforced concrete pipe for the Ashtabula County Engineer’s Department.
• Awarded quotations and authorized the Department of Planning and Development to enter into an agreement with Daughters Excavating Co. LLC for Household Sewage Treatment System, Water Pollution Control Loan Fund for an applicant on State Route 46 South. The total contract is $20,000, with a $3,000 homeowner share and $17,000 HSTS share.
• Awarded quotations and authorized the Department of Planning and Development to enter into an agreement with Potters Company for Household Sewage Treatment System, Water Pollution Control Loan Fund for an applicant on Stumpville Road. The total contract is $17,813.66, with a $0 homeowner share and $17,813.66 HSTS share.
• Approved an agreement with ESI Acquisitions, Inc. for Emergency Operations Center for the Ashtabula County Emergency Management Agency.
The cost is not to exceed $13,697.38. Term begins upon signing and terminates in two years.
Kozlowski said this is paid for with special EMA funds that they receive.
• Approved an amendment to Title IV-D service contract with the Ashtabula County Child Support Enforcement Agency and the Ashtabula County Common Pleas Court.
• Approved a Memorandum of Understanding between Ashtabula County community partners and the Ashtabula County Children Services Board to address child abuse and neglect. The partners are the Ashtabula County Court of Common Pleas – Juvenile Division, the Ashtabula County Sheriff’s Department, the city and village police departments in the county, Ashtabula County Prosecutor, Ashtabula County Department of Job & Family Services, Ashtabula County Humane Society, Ashtabula Area Child Advocacy Center and Ashtabula County Children Services.
• Accepted the resignation of Patricia DuPuy from the Ashtabula County Mental Health & Recovery Services (MHRS) Board, effective Feb. 18, 2026.
• Re-appointed Jarrod Dixon for a three-year term to the Ashtabula County Planning Commission, commencing March 27, 2026, and continuing through March 28, 2029.
• Approved sewer and water builders licenses for various contractors: Marous Brothers Construction, Davis Diggers Inc., Dana Daughters Excavating Co LLC, North East Site Development, Fabrizi Trucking & Paving Co Inc., Alleghany Construction Inc. and Simak Trucking & Excavating Inc.